Information Systems Security Engineering Professional 試験対策問題集
現行試験バージョン ISSEP に対応した問題を 750 問公開しています。フリー問題(20 問)は登録なしで問題文と選択肢を閲覧できます。
模擬試験モードの設定
| 試験バージョン | ISSEP |
|---|---|
| 出題数 | 125 問 |
| 制限時間 | 180 分 |
| 合格基準スコア | 70 点 |
| 出題分野 | 5 分野 |
上記は本サイトの模擬試験モードの設定値です。実際の試験の出題数・制限時間・合格基準は、各認定プログラムの公式サイトでご確認ください。
出題分野
- Systems Security Engineering Foundations(システムセキュリティ工学の基礎)(出題比率 24%)
- Risk Management(リスク管理)(出題比率 20%)
- Security Planning and Engineering(セキュリティの計画と設計)(出題比率 22%)
- Implementation, Verification and Validation(実装と検証と妥当性確認)(出題比率 20%)
- Secure Operations, Change Management and Disposal(運用・変更・廃棄)(出題比率 14%)
フリー問題
- A vendor offers to automate alert triage for a control network and demonstrates …
- Security work is being done by staff charged to another project, and the program…
- A purchased analytics product is found to contain a pre-trained model, and the a…
- A program plans to automate the triage of model output reviews and finds that a …
- A security requirement was not met and nobody can say who allowed the program to…
- Operators on a defense mission system have been reversing a configuration change…
- Every serious incident on a control network in the past two years began on a wee…
- A design assumed operators would review an alert queue twice per shift, and in p…
- A risk assessment for a system is handed over as the assessment for its operatio…
- Integrating two systems creates new flows across what used to be an outer bounda…
- A design passed a panel review by senior engineers and the technicians who use i…
- Three identical proxies in series were all bypassed by one request that none of …
- One specification was written for a learned component and applied to both its tr…
- Every test in a campaign passed and the users say the system does not do what th…
- Hardening a purchased appliance to the program's baseline disables three feature…
- The binary tested in staging and the binary running in production came from two …
- Three releases in the past quarter went to production while a security gate was …
- A disposal program is complete and the only evidence is the completion report wr…
- A monitoring design for a water treatment network specifies which values will be…
- An operations plan for a power dispatch center describes what the security staff…
残りの 730 問は有料プランで演習・模擬試験に使えます。