Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) v4.0 試験対策問題集

現行試験バージョン CTAL-TTA に対応した問題を 270 問公開しています。フリー問題(20 問)は登録なしで問題文と選択肢を閲覧できます。

模擬試験モードの設定

試験バージョンCTAL-TTA
出題数45 問
制限時間120 分
合格基準スコア65 点
出題分野6 分野

上記は本サイトの模擬試験モードの設定値です。実際の試験の出題数・制限時間・合格基準は、各認定プログラムの公式サイトでご確認ください。

出題分野

  • The Technical Test Analyst's Tasks in Risk-Based Testing(出題比率 9%)
  • White-Box Test Techniques(ホワイトボックステスト技法)(出題比率 18%)
  • Static and Dynamic Analysis(静的解析と動的解析)(出題比率 13%)
  • Quality Characteristics for Technical Testing(品質特性)(出題比率 29%)
  • Reviews(レビュー)(出題比率 9%)
  • Test Tools and Automation(テストツールと自動化)(出題比率 22%)

フリー問題

  1. Halfway through the project for a card payment platform, new information shows t…
  2. A Technical Test Analyst has been asked to help identify the technical product r…
  3. A payment platform exposes a public interface that other companies call from the…
  4. A utility function contains no decisions at all. A coverage tool reports its dec…
  5. A component contains a default case in a switch statement even though every poss…
  6. A team has finished applying black-box test techniques to a component and has me…
  7. A control flow analysis of a scheduling component reports several anomalies. Whi…
  8. A team separates data flow analysis from data flow testing while planning the te…
  9. A product risk for a payment gateway states that the settlement records might no…
  10. A product risk for a hotel booking platform states that response times may becom…
  11. A satellite ground station team has strengthened the encryption and tightened th…
  12. A product risk for a railway signaling system states that the loss of one subsys…
  13. A team compares when security tests and performance tests belong in the lifecycl…
  14. A flight management platform has just been installed on a new site, and the team…
  15. A Technical Test Analyst reviews the architecture of a public website against th…
  16. A Technical Test Analyst is invited to a technical review of an integration leve…
  17. A team describes the intended execution-time behavior of a controller as a finit…
  18. A project puts a strong emphasis on test automation and appoints a specialist fo…
  19. A team models the business process for canceling an order so that it can be driv…
  20. A Technical Test Analyst is starting a test execution automation project for a c…

残りの 250 問は有料プランで演習・模擬試験に使えます。

この資格の学習を始める

無料会員に登録すると、フリー問題を演習モードで解いて正答率を記録できます。

無料会員に登録する有料プランの内容を確認する