問題文
A team maps each stage of an integration's life to the Anypoint tool that supports it. Which mapping across the lifecycle is correct?
選択肢
- There is no relationship between lifecycle stages and Anypoint components, and any of the tools can be used at any stage at all.
- Design in Design Center, build in Studio or Code Builder, share in Exchange, deploy and run via Runtime Manager and CloudHub, and observe with Monitoring.
- Design in Runtime Manager, build in Exchange, share in Monitoring, and deploy in Design Center, given that each tool suits the stage least related to its purpose.
- Every stage is performed in a single tool called Anypoint Studio, given that Studio is the only component and Design Center, Exchange, and Monitoring do not exist.