フリー問題

Certified Tester Performance Testing (CT-PT) 2018 のフリー問題 10 / 20 問目

問題文

A subsystem receives its work not from people but from three upstream machines whose input rates differ. Which analysis does the syllabus recommend for building the operational profiles in that setting, and with whom?

選択肢

  1. The detailed reading of the holding reserves and the standing lines, carried alongside the platform architects.
  2. The detailed reading of the holding stores and the waiting lines, carried alongside the timed alignments.
  3. The detailed reading of the holding stores and the waiting lines, carried alongside the meddling intrusions.
  4. The detailed reading of the holding stores and the waiting lines, carried beside the mixed variations.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。