問題文
The environment is deployed, the generators are installed and the monitors are configured, and the team is about to start the full campaign. Which step does the syllabus place immediately before execution?
選択肢
- Validating the setting with a controlled batch of trials and checking that the watching tools follow the redrawn placements.
- Validating the setting with a steered batch of trials and checking that the watching tools track the onboard radios.
- Validating the setting with a controlled batch of trials and verifying that the observing helpers follow the important readings.
- Validating the setting with a controlled batch of trials and checking that the watching tools follow the mimicked stubs.