問題文
A team must leave a known configuration in place for two weeks while a migration finishes, and does not want the corresponding Issue to keep drawing attention during that period. Which approach fits?
選択肢
- Lower the severity of that one Issue, and of the Findings behind it, so that the list of open work sorts it to the bottom.
- Ignore that one Issue with an expiration set to the end of the migration, so it returns on its own afterward.
- Ignore that one Issue with no expiration date, and rely on the team to revisit it after the migration is complete and verified in staging.
- Delete the Issue, together with the Findings that were correlated into it, from the portal.