Splunk Core Certified User のフリー問題 18 / 20 問目

問題文

An analyst has a result table and is choosing a visualization for it. Which statements about the relationship between the table and the chart are correct? (Select two.)

選択肢

  1. A chart that plots a value over time needs the time to be one of the columns of the table.
  2. Any result table can produce any chart type, because the platform reshapes the table to fit whichever visualization is selected.
  3. A chart can be built from the event list if it holds numbers.
  4. The shape of the table decides which chart types can be used, so not every table works with every chart.
  5. The number of rows in the table has to be below the chart's row limit, otherwise the chart is drawn from a random sample of the rows.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。