問題文
During a discovery workshop at a logistics company, the architect learns that all configuration is done in production, the only sandbox was refreshed 14 months ago, and there is no repository. How should the architect characterize the current lifecycle maturity in the assessment report?
選択肢
- As the highest level, because production is always current, and a customer working directly in the live org sees every change take effect the moment it is made.
- As the lowest level, where changes are made in the live org and no version of the configuration exists outside it.
- As a mid-level maturity, because the company has a sandbox, and having any sandbox at all means the organization already separates development from production even if the refresh cadence is not aligned with the delivery calendar.
- As unmeasurable, because maturity can only be assessed after a repository exists and a baseline of the metadata has been captured for comparison.