問題文
The protection feature is already switched on and an administrator wants to shorten the waiting time so that space comes back sooner tonight. The engineer has to say what the feature covers and what changing it requires. Which pair states those two points?
選択肢
- The protection is already switched on, so the covered action covers the manual compaction and the settings change needs the opened intake in that documentation.
- The protection is already switched on, so the covered action covers the manual compaction and the settings change needs the opened escalation in that documentation.
- The protection is already switched on, so the covered action covers the manual purging and the settings change needs the opened intake in that documentation.
- The protection is already switched on, so the covered action covers the manual purging and the settings change needs the opened escalation in that documentation.