A continuity plan states two numbers: how much recent work may be lost and how long the service may be unavailable. Which pair states what the first objective bounds and what the second objective bounds?
選択肢
- The specification for the two objectives separates both meanings, so the first objective bounds the plain data and the second objective bounds the whole downtime in that study.
- The specification for the two objectives separates both meanings, so the first objective bounds the plain log and the second objective bounds the whole degradation in that study.
- The specification for the two objectives separates both meanings, so the first objective bounds the plain log and the second objective bounds the whole downtime in that study.
- The specification for the two objectives separates both meanings, so the first objective bounds the plain data and the second objective bounds the whole degradation in that study.