問題文

The contractor writes done against a row the day the code is committed. The counter team has not tried it, and the acceptance check has not run. When is a row done?

選択肢

  1. The state called done on each row is reached at the coding point of the requirements register, and the step where the code is written keeps the ultimate value of the same list.
  2. The state called done on each row is reached at the coding point of the requirements register, and the step where the code is written keeps the preceding value of the same list.
  3. The state called done on each row is reached at the validated point of the requirements register, and the step where the code is written keeps the preceding value of the same list.
  4. The state called done on each row is reached at the validated point of the requirements register, and the step where the code is written keeps the ultimate value of the same list.