PECB Certified ISO/IEC 42001 Lead Implementer のフリー問題 9 / 20 問目

問題文

The firm means to watch how well the scoring holds up once it is running. The plan says that the outcomes will be watched and no more than that. Nobody has written what a bad month would look like, and nobody has said how often anybody will look. Two entries are blank. The first entry has to say what has to be done about what counts as going wrong. The second entry has to say what has to be done about how often the firm looks. Which pairing fills the two entries?

選択肢

  1. What counts as the scoring performing badly is suspended while the project plan is still being drawn, and the interval at which the monitoring will look for it is argued in the same documentation, and the front sheet is then stamped.
  2. What counts as the scoring performing badly is suspended while the project plan is still being drawn, and the interval at which the monitoring will look for it is agreed in the same documentation, and the front sheet is then stamped.
  3. What counts as the scoring performing badly is specified while the project plan is still being drawn, and the interval at which the monitoring will look for it is argued in the same documentation, and the front sheet is then stamped.
  4. What counts as the scoring performing badly is specified while the project plan is still being drawn, and the interval at which the monitoring will look for it is agreed in the same documentation, and the front sheet is then stamped.