フリー問題

PECB Certified ISO/IEC 42001 Lead Implementer のフリー問題 19 / 20 問目

問題文

Some of the arm's personnel are uneasy about the ISO/IEC 42001 certification audit, and the parent wants two things written down before the certification body's visit. The first entry is about what the certification audit is aimed at. The second entry is about the part the audit team takes when it finds a gap against the requirements. Which pairing fills the two entries?

選択肢

  1. What the certification audit is aimed at is each person's own showing in their trade, and the part the audit team takes when it finds a gap is to set it down and leave the fix to the arm, and the note is then stamped.
  2. What the certification audit is aimed at is the management system and not the people, and the part the audit team takes when it finds a gap is to draw up the fix and hand that to the arm, and the note is then stamped.
  3. What the certification audit is aimed at is each person's own showing in their trade, and the part the audit team takes when it finds a gap is to draw up the fix and hand that to the arm, and the note is then stamped.
  4. What the certification audit is aimed at is the management system and not the people, and the part the audit team takes when it finds a gap is to set it down and leave the fix to the arm, and the note is then stamped.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。