フリー問題

PECB Certified ISO/IEC 42001 Lead Auditor のフリー問題 2 / 20 問目

問題文

A water board is labeling two research projects in its portfolio. The first project builds a controller that accepts vague and partly true inputs, such as a report that the water is fairly warm, and still settles on a usable valve position. The second project builds an assistant that helps a planner by imitating the way an experienced engineer talks himself through a fault. Two labels are blank, one for each project. Which pair of labels is correct?

選択肢

  1. The first project is labeled soft computing and the second project is labeled cognitive computing.
  2. The first project is labeled utility computing and the second project is labeled semantic computing.
  3. The first project is labeled soft computing and the second project is labeled semantic computing.
  4. The first project is labeled utility computing and the second project is labeled cognitive computing.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。