問題文
A build step assigns a value, and the team wants a later stage of the same pipeline to read it. What does the build specification have to contain?
選択肢
- The specification therefore needs one inline listing before that value can travel, and the stages that receive it are downstream within the same run.
- The specification therefore needs one mandatory listing before that value can travel, and the stages that receive it are downstream within the same run.
- The specification therefore needs one mandatory listing before that value can travel, and the stages that receive it are upstream within the same run.
- The specification therefore needs one inline listing before that value can travel, and the stages that receive it are upstream within the same run.