問題文

Before a Grid Infrastructure upgrade, a DBA wants the installer to verify that the system is ready without changing anything. Which statement describes the dry-run upgrade mode?

選択肢

  1. The cluster verification utility is run with the upgrade option, and it writes the readiness of every node into the cluster registry, so that the installer can read it later.
  2. A new Grid home is created and the installer is started with the dry-run flag, and the installer checks the storage, the network, and the requirements without running any of the configuration tools.
  3. The existing Grid home is used and the installer is started with the dry-run flag, and the installer checks the storage, the network, and the requirements without running any configuration tool.
  4. A new Grid home is created, and the installer is started with the dry-run flag, and the installer performs the upgrade on one node, so the result can be inspected before the other nodes follow.