問題文
A team is sizing the wiring closet before a Wi-Fi 7 refresh and has to say what the wired side must supply before the new radios can reach the rates they are sold on. Which statement describes what has to be ready first?
選択肢
- Before the Wi-Fi 7 radios can reach those rates, the uplink has to be split into two links, and the power plan has to be measured again at every wall plate in the room.
- Before the Wi-Fi 7 radios can reach those rates, the uplink has to be moved to a management VLAN of its own, and the power plan has to be shifted to a battery unit in the same enclosure.
- Before the Wi-Fi 7 radios can reach those rates, the uplink has to be tagged for every client VLAN, and the power plan has to be lowered because the newer radio draws less than the one before it.
- Before the Wi-Fi 7 radios can reach those rates, the uplink has to run at a multigigabit speed, and the power plan has to allow for every extra radio that the 6 GHz band brings.