フリー問題

Certified Tester Security Test Engineer (CT-STE) v1.0.1 のフリー問題 16 / 20 問目

問題文

The check step of an improvement cycle has so far covered only a dynamic black-box run against one application. The engineer is asked to raise the maturity of the management system rather than repeat the same run. What should the new work serve as, and what does the next step produce?

選択肢

  1. Placed inside the improvement cycle this result acts as the planned confirmation, and the step that takes it up produces the recorded closure.
  2. Placed inside the improvement cycle this result acts as the unplanned insight, and the step that takes it up produces the additional safeguard.
  3. Placed inside the improvement cycle this result acts as the contractual benchmark, and the step that takes it up produces the inserted provision.
  4. Placed inside the improvement cycle this result acts as the engineered countermeasure, and the step that takes it up produces the issued directive.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。