フリー問題

Certified Tester Performance Testing (CT-PT) 2018 のフリー問題 13 / 20 問目

問題文

The load tool has no monitoring built in, so a separate monitor will be used. Which requirement does the syllabus attach to that arrangement?

選択肢

  1. The watching should begin separately and the gathered figures must match the timed alignments.
  2. The watching should begin separately and the gathered figures must suit the varied mixtures.
  3. The watching should begin separately and the gathered figures must suit the intrusive meddling.
  4. The watching should begin separately and the gathered figures must suit the ensuing weighing.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。