問題文
A team automates execution of a pump controller with data-driven testing and finds that the second script in a chain always fails. Which pair of steps does the syllabus require for data-driven adaptation, and what does the chaining need?
選択肢
- Provide the concrete input values and the expected results, link them to the model data, and set the estimated ownership before each script runs.
- Provide the concrete input values and the expected results, link them to the model data, and set the operational documentation before each script runs.
- Provide the concrete input values and the expected results, link them to the model data, and set the required precondition before each script runs.
- Provide the concrete input values and the expected results, link them to the model data, and set the circulated instructions before each script runs.