フリー問題

Certified Tester Model-Based Tester (CT-MBT) v1.1 のフリー問題 19 / 20 問目

問題文

A team wires its MBT tools into the continuous integration server of a logistics platform. Which good practice does the syllabus name for that situation?

選択肢

  1. Call the MBT tools from the build, because a self-testing build checks the stored baselines with the selected scripts as well.
  2. Call the MBT tools from the build, because a self-testing build checks the approved contract with the licensing renewal as well.
  3. Call the MBT tools from the build, because a self-testing build checks the earlier reports with the review comments as well.
  4. Call the MBT tools from the build, because a self-testing build checks the fresh content with the generated tests as well.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。