フリー問題

Certified Tester Game Testing (CT-GaMe) v1.0.1 のフリー問題 17 / 20 問目

問題文

A map is complete and no further work is planned on it. Which task does the syllabus assign to the tester rather than to the level designer or the artist?

選択肢

  1. Checking the chances of the starting party, because the designer works with the tuned version.
  2. Checking the shade of the painted surface, because the artist works with the visible version.
  3. Checking the escape of the finished map, because the tester works with the final version.
  4. Checking the area of the placed shelter, because the designer works with the early version.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。