フリー問題

ISACA Data Science Fundamentals Certificate のフリー問題 6 / 20 問目

問題文

A correction requires the last 14 days of the demand table to be rebuilt. The team runs the daily job again for those dates and the row count for the period doubles. Which statement about this case is correct?

選択肢

  1. The reprocessing job needs date scoped replacement, because a repeated run must produce matching row totals.
  2. The reprocessing job needs date scoped appending, because a repeated run must produce matching row totals.
  3. The reprocessing job needs date scoped replacement, because a repeated run must produce matching run timings.
  4. The reprocessing job needs date scoped appending, because a repeated run must produce matching run timings.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。