フリー問題

PowerCenter Data Integration 10 Developer, Professional Certification のフリー問題 20 / 20 問目

問題文

Two habits of picking a run up again are checked. First, of two states of work that can be kept, one is not kept merely because pick-up has been turned on for the run, while the other need not be kept at all for the first one to be kept. Second, when a notice is sent out because the run is being held, a second failure brings no second notice at one moment but does bring one at the other. Which pairing fits?

選択肢

  1. The workflow state of work is not kept merely because pick-up has been turned on for the run, and the session state of work need not be kept for the first to be kept, while a failure that falls after pick-up has ended brings no second notice and a failure that falls midway through the holding brings one.
  2. The workflow state of work is not kept merely because pick-up has been turned on for the run, and the session state of work need not be kept for the first to be kept, while a failure that falls midway through the holding brings no second notice and a failure that falls after pick-up has ended brings one.
  3. The session state of work is not kept merely because pick-up has been turned on for the run, and the workflow state of work need not be kept for the first to be kept, while a failure that falls midway through the holding brings no second notice and a failure that falls after pick-up has ended brings one.
  4. The session state of work is not kept merely because pick-up has been turned on for the run, and the workflow state of work need not be kept for the first to be kept, while a failure that falls after pick-up has ended brings no second notice and a failure that falls midway through the holding brings one.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。