フリー問題

Data Quality 10 Administrator, Professional Certification のフリー問題 15 / 20 問目

問題文

An instance of the resident record workflow has stopped responding, so the city weighs the two orders that it can give to bring the instance to an end. The team is also reading the separate file that the Data Integration Service writes for the mapping inside that workflow. Which pairing is correct?

選択肢

  1. The order of the two that allows a task already under way to reach its own finish before the instance stops is an abort, and the load summary of the mapping run is a thing that the separate mapping log skips.
  2. The order of the two that allows a task already under way to reach its own finish before the instance stops is a cancel, and the load summary of the mapping run is a thing that the separate mapping log shows.
  3. The order of the two that allows a task already under way to reach its own finish before the instance stops is a cancel, and the load summary of the mapping run is a thing that the separate mapping log skips.
  4. The order of the two that allows a task already under way to reach its own finish before the instance stops is an abort, and the load summary of the mapping run is a thing that the separate mapping log shows.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。