フリー問題

Certified AI Governance Professional のフリー問題 2 / 20 問目

問題文

The life cycle policy names one gate before design starts and one gate before release. Which pairing names the artifact each of those two gates requires?

選択肢

  1. Required before design is the selfdeclared brief of the plan, and required before release is the postlaunch signoff that the release documentation will not open the gate without.
  2. Required before design is the impactstudy brief of the plan, and required before release is the preproduction signoff that the release documentation will not open the gate without.
  3. Required before design is the impactstudy brief of the plan, and required before release is the postlaunch signoff that the release documentation will not open the gate without.
  4. Required before design is the selfdeclared brief of the plan, and required before release is the preproduction signoff that the release documentation will not open the gate without.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。