問題文
The hospital group must design quality gates for the clinical pipeline. Which two assignments of expectation action to requirement are correct? (Select two.)
選択肢
- A measurement slightly outside the expected range should be tracked but not block the load: the warn action, which writes the record to the target and records the failure count.
- A cross-table referential check: an expectation constraint with a subquery against the reference table.
- Records that must be kept out of the target but inspected later: the drop action, which writes them to a quarantine table.
- A null patient identifier must stop the update because downstream reporting cannot proceed safely: the fail action.
- A requirement to see the failure count over time for a check that must also stop the pipeline: the fail action, which records metrics before failing.