フリー問題

Designing Cisco Security Infrastructure v1.0 のフリー問題 1 / 20 問目

問題文

A reviewer has to write down what a firm has to have settled before the first phase of a firewall rollout may open, if no requirement list has been drawn up yet. Which reading does NIST SP 800-41 support, and what does it place inside the step that settles it?

選択肢

  1. The firm has to have found that a screening device is needed to carry out its own written policy, and that finding falls out of a study of danger taking in the threats to the system, the harm a loss of secrecy would bring, then the naming and weighing of the controls, in that pre-planning study.
  2. The firm has to have drafted the ruleset the screening device will carry, and that draft falls out of a list of traffic taking in the ports open on the system, the load a busy hour would bring, then the naming and grouping of the applications, in that pre-planning study.
  3. The firm has to have fixed the model number of the screening device it will buy, and that choice falls out of a survey of the market taking in the throughput of the system, the price a year of support would carry, then the naming and rating of the vendors, in that pre-planning study.
  4. The firm has to have settled the room the screening device will stand in, and that placing falls out of a review of the site taking in the power drawn by the system, the heat a full rack would give off, then the naming and locking of the cabinets, in that pre-planning study.

解答・解説を確認するには

正解と解説の確認、回答の記録には無料登録が必要です。登録すると演習モードでフリー問題に回答し、正誤と解説をその場で確認できます。