問題文
An engineer gathers records of the traffic across a fabric and reads the limits on the gathering and on the way of running. Which statement is correct?
選択肢
- The longest span the list offers for gathering the records is 20 minutes; the store behind the show command holds 10,000,000 flows; and running the two ways side by side inside one fabric is let go, the documentation laying the whole of it down.
- The longest span the list offers for gathering the records is 40 minutes; the store behind the show command holds 1,000,000 flows; and running the two ways side by side inside one fabric is let go, the documentation laying the whole of it down.
- The longest span the list offers for gathering the records is 40 minutes; the store behind the show command holds 10,000,000 flows; and running the two ways side by side inside one fabric is held back, the documentation laying the whole of it down.
- The longest span the list offers for gathering the records is 20 minutes; the store behind the show command holds 1,000,000 flows; and running the two ways side by side inside one fabric is held back, the documentation laying the whole of it down.