問題文
An enterprise asks what baseline of competence it has to reach before a significant deployment becomes possible. What does the guidance say that baseline includes?
選択肢
- Having reached the second maturity stage in every pillar, since cross-pillar solutions are the prerequisite for any deployment of a size that would matter to the business as a whole and to each of the teams inside it.
- Having selected the products, since the baseline is defined by the capabilities that the chosen platform provides to the enterprise that has already bought them.
- Having assets, subjects, business processes, traffic flows, and dependency mappings identified and cataloged, which the enterprise needs before it can develop a list of candidate business processes.
- Having decommissioned the perimeter controls for at least one segment, because a deployment that coexists with the perimeter cannot demonstrate that the new controls are the ones doing the work and the baseline therefore requires a clean segment to start from.