Oracle Database 19c: Data Guard Administration 試験対策問題集
現行試験バージョン 1Z0-076 に対応した問題を 444 問公開しています。フリー問題(20 問)は登録なしで問題文と選択肢を閲覧できます。
模擬試験モードの設定
| 試験バージョン | 1Z0-076 |
|---|---|
| 出題数 | 74 問 |
| 制限時間 | 120 分 |
| 合格基準スコア | 61 点 |
| 出題分野 | 8 分野 |
上記は本サイトの模擬試験モードの設定値です。実際の試験の出題数・制限時間・合格基準は、各認定プログラムの公式サイトでご確認ください。
出題分野
- Data Guard Basics and Oracle Net Services(基礎と通信サービス)(出題比率 11%)
- Creating and Maintaining a Physical Standby(物理スタンバイの作成と保守)(出題比率 11%)
- Read-Only, Snapshot, and Logical Standby(3種のスタンバイの活用)(出題比率 11%)
- Data Guard Broker Configuration and Monitoring(ブローカーの構成と監視)(出題比率 15%)
- Data Protection Modes and Role Transitions(保護モードと役割の切り替え)(出題比率 11%)
- Flashback Database and Fast-Start Failover(巻き戻しと自動フェイルオーバー)(出題比率 13%)
- Backup, Recovery, Patching, and Upgrading(バックアップと適用作業)(出題比率 12%)
- Tuning, Far Sync, Cascading, and Client Connectivity(調整と拡張)(出題比率 16%)
フリー問題
- A physical standby database has been created and is already receiving redo from …
- An administrator sets up redo transport between a primary named boston and a sta…
- Before a physical standby is created the team is told to place the primary in fo…
- A primary database grows by several tablespaces per month. The administrator wan…
- A release must be rehearsed against production data and the rehearsal will inser…
- A reporting team will run queries against a physical standby while the primary k…
- A configuration is managed by the broker and an administrator issues a command o…
- A maintenance window requires that a standby stop applying redo while it keeps r…
- An administrator has to compare the server parameter entries of a primary with t…
- A site adopts the synchronous method with the lighter acknowledgment to protect …
- A configuration must lose no committed transaction if the primary site is destro…
- A site plans to reinstate a former primary after any future failover instead of …
- A site wants protection against a mistaken update while keeping the standby read…
- An administrator creates a restore point on a primary before a risky change and …
- A major release upgrade must keep the application available for all but a few mi…
- A data file on the standby is lost and no recent backup of it exists on the stan…
- Backups are written on a standby and the site keeps only the control file of eac…
- A logical standby falls behind during a heavy batch window and the administrator…
- A monitoring dashboard must warn when a standby would cost the business data at …
- A primary already sends redo to a nearby standby and the business now wants a th…
残りの 424 問は有料プランで演習・模擬試験に使えます。