Everpure Certified FlashBlade Implementation Specialist 試験対策問題集
現行試験バージョン FBIS に対応した問題を 360 問公開しています。フリー問題(20 問)は登録なしで問題文と選択肢を閲覧できます。
模擬試験モードの設定
| 試験バージョン | FBIS |
|---|---|
| 出題数 | 60 問 |
| 制限時間 | 120 分 |
| 合格基準スコア | 70 点 |
| 出題分野 | 4 分野 |
上記は本サイトの模擬試験モードの設定値です。実際の試験の出題数・制限時間・合格基準は、各認定プログラムの公式サイトでご確認ください。
出題分野
- Pre-Installation/Upgrade(設置と更新の前提確認)(出題比率 18%)
- FlashBlade Single and Multi-Chassis Installation(筐体の設置)(出題比率 22%)
- Upgrades, Conversions, and Expansions(更新・変換・増設)(出題比率 38%)
- Post-Installation/Upgrade(設置後の確認と切り分け)(出題比率 22%)
フリー問題
- The boxes are open and the engineer is checking the small parts against the ship…
- The site has no path to the internet, so the engineer has to bring everything on…
- An engineer is filling in the power section of the pre-install worksheet for a n…
- The customer has spare cables on site and asks whether they can be used for the …
- Two engineers have to lift a chassis into a rack position above shoulder height …
- A newly delivered chassis will not accept the target release of the array softwa…
- The customer has one system with a single chassis and another that will grow to …
- A data address has to keep working when one of the two cables that carry it is p…
- The only slot the customer offers for adding a chassis is in the middle of the w…
- A junior engineer pulls a blade as soon as the progress bar looks full. The engi…
- The devices that have arrived are not the same size as the ones already in the b…
- A system that already spans several chassis is going to grow well beyond that. T…
- A customer with one chassis has bought a second one and wants to know what else …
- The customer is told that the conversion runs without an outage and asks what ac…
- A new blade with devices already fitted is going into a running chassis. The eng…
- A junior engineer asks whether the blade can be pulled as soon as the evacuation…
- The health check at the end of the work returns a page of output including two w…
- Two physical ports carry the data traffic and the same ports also carry manageme…
- An uplink between the array and the customer's switch stays up but the counters …
- The array reports a temperature warning and a power warning at the same time aft…
残りの 340 問は有料プランで演習・模擬試験に使えます。